-40%
2018 Orion SLS LAS Attitude Control Motor Arrival Kennedy SC 15 December
$ 1.97
- Description
- Size Guide
Description
SLS OrionLAS Control Motor
Arrives Kennedy SC
2018
Offering a cover serviced for arrival of SLS Orion LAS Attitude Control Motor Attival at Kennedy Space Center,
Cancelled KSC 15-December-2018
.
Orion
SLS LAS Attitude Control Motor Arrival
Kennedy Space Center -
Dec
ember
15
2018
The
Orion
SLS attitude control motor for the Launch Abort System (LAS) Aa-2 was delivered to Kennedy Space Center for final assembly on
Dec
ember
15
2018. The motors are being assembled and checked out at NASA’s Kennedy Space Center for an upcoming test for the
Orion
spacecraft designed to send astronauts on trips to the Moon, and support human exploration to Mars. The abort and jettison motors for the test arrived on August 27 and September 10, 2018
Track Page Views With
Auctiva's FREE Counter
For Non U.S. International Buyers
: Your item is normally sent by regular USPS First Class International Mail which
DOES NOT
have a Tracking Number. This provides a low-cost (.50 for up to approx. 6 items/covers) shipping cost. For high cost items the shipment will be made by USPS International First Class Package, which
HAS
a Tracking Number, the cost of which (starting at .50) and will be added to your invoice accordingly.
Due to the current worldwide health situation on mail delivery, most mail can be extremely slow, so please give delivery more time than usual.
For circumstances where mail has not been delivered requiring that I refund your payment, future mail to your address will be sent by the USPS International First Class Package rate and the amount will be added to your invoice. Whenever there is a question please contact me BEFORE bidding. Thank you for your business.